Sunday, April 6, 2014

I have been sewing

Just to prove it.... blocks for the crazy string block swap on the HGTV boards.

Saturday, April 5, 2014

I'm back...


and this is what I've been busy with :)

Wednesday, February 5, 2014

test post

I'm adding this to my bucket list :-)


Love This Quilt

Friday, March 1, 2013

Hanging sleeves

Method 1, Sew a Hanging Sleeve After the Quilt is Bound



Method 2, Add a Hanging Sleeve Before Binding the Quilt

You can sew a hanging sleeve to the top of the quilt at the same time you sew on the binding.
  1. Sandwich the quilt top, batting and backing. Quilt or tie. Trim batting and backing to match the quilt top along the edge where the sleeve will be sewn.
  2. Cut or piece together fabric to make a strip 9" tall and the same width as the quilt.
  3. Fold under short edges 1/4", wrong sides together. Fold under again. Press. Sew a straight or zigzag seam to hem the folds.
  4. Fold the strip lengthwise, wrong sides together, aligning raw edges.
  5. Center the folded strip along the top edge of the quilt, against the backing, aligning its matched raw edges with the edge of the quilt.
  6. Sew the sleeve to the quilt with an approximate 1/8" seam allowance.
  7. Bind the quilt. If you plan to use the tucked method to end doublefold binding, start binding on a side without the sleeve to help avoid bulk from extra layers of fabric.
  8. Finish the sleeve using Steps 6 through 8 on page 1.

Quilt Sleeve Options

  • You can use any fabric for the quilt sleeve, from plain muslin to something that enhances the reverse side of your quilt.
  • Quilt shows usually require a 4" minimum sleeve. Read show rules before assembling the sleeve for your quilt.
  • Use wide backing fabric to make a long sleeve without piecing strips of fabric. Use the same fabric you back the quilt with to make the sleeve blend with the backing.






Wednesday, September 19, 2012

Mobile Update - turning the corner before noon

We stopped for lunch early, one more side and I will have 2 full rounds quilted.

About 4 hours to go...


On the road again

Hand work till its my turn to drive, and a little closer quarters this trip.

We took my truck this time because the gas millage is better.



Tuesday, September 4, 2012

Hand work challenge


Bonnie Hunter is having an hour a day challenge, and here is my hand work project.  Just a little old quilt of bright squares.  

IMG_2203 
Really,   Ok so maybe not so little.  But I like it and I have a spare room with a bed and no quilt for it.   So until I win the lotto or we can stop supplementing our kids live, its hand quilt my tops or tie them. 

And I’m not ready to tie these quilts.

IMG_2204
So for now I sit and quilt – good thing I like to be warm because in the summer my husband cranks up the air and in the winter I have him stoke the fire.  My little corner of peace and quite  (never mind that thread on the chair…)

Monday, September 3, 2012

A nice weekend, just too short

Going home is bitter sweet..., I love to be home ~ just wish it was closer to the kids !



Friday, July 6, 2012

Moble update Dog Days

5 days over 100 degree, and no one has any energy


Tuesday, May 29, 2012

My Memorial Day Project

This was the project I worked on this weekend.  As my daughter would say – its not my usual style.  But I kinda like it!

smRoyalBlocks

smFabric I had about half the brights and a little more than half the muslin strips.  So I guess it helped get rid of the stash. 

I did go out an buy a little more brights.  So I would really call it a wash.  :p

smRoyalBlocksClose

The Memorial Day Weekend

The HGTV message board had a Red, White & Blue Patriotic Craft Show to celebrate the holiday.   My entry…

smStarsRWB 

I finally finished my Smokey Mountain Stars from Bonnie Hunters site.  You can find the free pattern here at Quiltville.com.

Even the back is Patriotic – scraps to fill in the back instead of another length of backing. All those scraps from thrift store shirts.

smStarsBackRWB    smStarsCloseRWB

Sunday, May 20, 2012

I work best under pressure

Its DONE and on its way to MN.  Cydnee turns 1 in a few weeks and it will be there for her.

done01   done02 

 done08  done09

Saturday, May 19, 2012

Another One Almost Done

I think I need to shop for more black for bindingsmCydnee

Sunday, March 25, 2012

Another Bonnie Mystery done…

Last year Bonnie Hunter’s Mystery was Roll Roll Cotton Boll.  I finished my last week.  It took this long to get help taking a photo, but here it is….

smRRCB

smRRCB02    smRRCBupc  
Bonnie’s site is Quiltville.com   This pattern has been taken down, but will be in her next book :)

Thursday, March 22, 2012

March Block of the Month

03MarBOM

 

I have been doing these blocks since January.  My thought – blue and white with a little yellow/gold while  trying to use up some of my shirting and strips.

 

Here is my March BOM…..

 

and here is the group so far:

03aMarBOM

Wednesday, March 21, 2012

a Quilters Eye

While in a Chicago Dr’s office I saw this on the table.  Pretty!!!

IMG_1533

IMG_1534

 

And it turned out really interesting.  I read the entire pamphlet – and I believe this should be required reading for everyone I know!

Tuesday, March 20, 2012

Swap blocks due in Sept

and I’m half way done.  Well I need to sign them all, but 33 of the needed 60 are together.  And

about 10 more are cut and ready sew. 

sigBlocks

All from stash, PURPLE STASH!  :)

Sunday, March 18, 2012

March 17, 2012

10 days after the 4+ inches of snow…..

Before

before

and After

after

Friday, March 2, 2012

March 2nd ?????

I know we had a mild winter but its March! 

smSnow02 

in like a lion……

smSnow01